Home > News
.jpg)
USA, Nevada: Two new energy substations in South Lyon are under construction to reduce the reliability and capacity of the area.
The new Mason Valley and Smith Valley substations, with power transformers and associated electrical equipment, will be ready for operation by next summer, reports Reno Gazette-Journal.
After the new substation is running, Yerington's 40-year-old Bridge Street and Anaconda substation and the Smith Valley substation will be powered down and removed.
Article from:
http://www.transformers-magazine.com/
